Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Spliced piles for 100-ft. Lengths for wharf construction
Method employed in construction of wharves and other works; piles are spliced to hexagonal shape to receive 4 by 6-in. splicing timbers; advantages of spliced piles.
Spliced piles for 100-ft. Lengths for wharf construction
Method employed in construction of wharves and other works; piles are spliced to hexagonal shape to receive 4 by 6-in. splicing timbers; advantages of spliced piles.
Spliced piles for 100-ft. Lengths for wharf construction
Eng. News-Rec
Shaw, A.M. (Autor:in)
Engineering News Record ; 100
1928
2 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Spliced piles for 100-ft. Lengths for wharf construction
Engineering Index Backfile | 1928
|Spliced concrete piles fill offshore construction gap
Engineering Index Backfile | 1961
|Concrete-spliced wood piles answer need for 55-ft lengths in venezuelan dock
Engineering Index Backfile | 1949
|Gunited hardwood piles for wharf structures
Engineering Index Backfile | 1952
|