Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Spliced concrete piles fill offshore construction gap
Combination of shallow offshore water and long concrete piles presented construction problem in erecting platform; piles were fabricated in 2 pieces short enough to be handled by small, shallow-draft derrick barge; after driving first section, second is welded atop first and then spliced pile is driven; steel tip was used to drive through to sandy foundation; welding operation.
Spliced concrete piles fill offshore construction gap
Combination of shallow offshore water and long concrete piles presented construction problem in erecting platform; piles were fabricated in 2 pieces short enough to be handled by small, shallow-draft derrick barge; after driving first section, second is welded atop first and then spliced pile is driven; steel tip was used to drive through to sandy foundation; welding operation.
Spliced concrete piles fill offshore construction gap
Oil Gas J
McGhee, E. (Autor:in)
Oil and Gas Journal ; 59
1961
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Driving of spliced reinforced-concrete piles
Engineering Index Backfile | 1928
|Concrete piles spliced with a quick-hardening concrete
Engineering Index Backfile | 1928
|Corrosion protection of precast concrete spliced piles
British Library Conference Proceedings | 1993
|Spliced piles for 100-ft. Lengths for wharf construction
Engineering Index Backfile | 1928
|