Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Shoring problems proved difficult on building job
Excavation; sheet piling; driving sheet piling; needling and bracing; caissons; filling with concrete; cantilever girders; setting steel.
Shoring problems proved difficult on building job
Excavation; sheet piling; driving sheet piling; needling and bracing; caissons; filling with concrete; cantilever girders; setting steel.
Shoring problems proved difficult on building job
Eng. Contracting
Wagner, K.R. (Autor:in)
1928
5 pages
9 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Difficult shoring work for buildings in Chicago
Engineering Index Backfile | 1906
Special shoring for building excavation
Engineering Index Backfile | 1942
Shoring topples at building site
Engineering Index Backfile | 1964
Engineering Index Backfile | 1935
|Springer Verlag | 2022
|