Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
8.9 mile highway contract requires 1,166,000 cu. Yd. Excavation
Problems encountered in grading so-called American Canyon Cut-off between Cordelia and Carquinez Toll Bridge across arm of San Francisco Bay, Calif.
8.9 mile highway contract requires 1,166,000 cu. Yd. Excavation
Problems encountered in grading so-called American Canyon Cut-off between Cordelia and Carquinez Toll Bridge across arm of San Francisco Bay, Calif.
8.9 mile highway contract requires 1,166,000 cu. Yd. Excavation
Roads Streets
Pierce, R.E. (Autor:in)
Roads and Streets ; 87
1934
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
5-mile road job requires 700,000 Cu. Yd. Excavation
Engineering Index Backfile | 1942
Engineering Index Backfile | 1930
|New 69-mile Everglades highway
Engineering Index Backfile | 1940
Engineering Index Backfile | 1948