A platform for research: civil engineering, architecture and urbanism
8.9 mile highway contract requires 1,166,000 cu. Yd. Excavation
Problems encountered in grading so-called American Canyon Cut-off between Cordelia and Carquinez Toll Bridge across arm of San Francisco Bay, Calif.
8.9 mile highway contract requires 1,166,000 cu. Yd. Excavation
Problems encountered in grading so-called American Canyon Cut-off between Cordelia and Carquinez Toll Bridge across arm of San Francisco Bay, Calif.
8.9 mile highway contract requires 1,166,000 cu. Yd. Excavation
Roads Streets
Pierce, R.E. (author)
Roads and Streets ; 87
1934
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
5-mile road job requires 700,000 Cu. Yd. Excavation
Engineering Index Backfile | 1942
Engineering Index Backfile | 1930
|New 69-mile Everglades highway
Engineering Index Backfile | 1940
Engineering Index Backfile | 1948