Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method used to excavate bedrock for pier foundations of Golden Gate Bridge because of high velocity and roughness of water; blasting tube used to guide charges.
Method used to excavate bedrock for pier foundations of Golden Gate Bridge because of high velocity and roughness of water; blasting tube used to guide charges.
Blasting rock underwater without drilling
Excavating Engr
Graham, J. (Autor:in)
Excavating Engineer ; 28
1934
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rock breakage by crushing, blasting, and drilling
Elsevier | 1967
|Study on the Optimizing Parameters of Underwater Drilling Blasting
British Library Conference Proceedings | 2012
|Experience in drilling and blasting operations to Loosen underwater rocks
Online Contents | 1983
|Experience in drilling and blasting operations to Loosen underwater rocks
Springer Verlag | 1983
|Uplift pile construction method without rock blasting
Europäisches Patentamt | 2015
|