A platform for research: civil engineering, architecture and urbanism
Method used to excavate bedrock for pier foundations of Golden Gate Bridge because of high velocity and roughness of water; blasting tube used to guide charges.
Method used to excavate bedrock for pier foundations of Golden Gate Bridge because of high velocity and roughness of water; blasting tube used to guide charges.
Blasting rock underwater without drilling
Excavating Engr
Graham, J. (author)
Excavating Engineer ; 28
1934
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rock breakage by crushing, blasting, and drilling
Elsevier | 1967
|Study on the Optimizing Parameters of Underwater Drilling Blasting
British Library Conference Proceedings | 2012
|Experience in drilling and blasting operations to Loosen underwater rocks
Springer Verlag | 1983
|Experience in drilling and blasting operations to Loosen underwater rocks
Online Contents | 1983
|