Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Winter curing of concrete in bridge arch rings
In constructing concrete bridge composed of five main river arch spans, each 162 ft. in length, across West branch of Susquehanna River and over tracks of Pennsylvania Railroad at Hyner; forms were heated with salamanders and steam lines for 12 to 24 hours before concrete was placed.
Winter curing of concrete in bridge arch rings
In constructing concrete bridge composed of five main river arch spans, each 162 ft. in length, across West branch of Susquehanna River and over tracks of Pennsylvania Railroad at Hyner; forms were heated with salamanders and steam lines for 12 to 24 hours before concrete was placed.
Winter curing of concrete in bridge arch rings
Contractors Engrs. Monthly
Jackson, S.W. (Autor:in)
1929
2 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Arch bridge encased concrete curing system and curing method
Europäisches Patentamt | 2023
|Protective measures make possible winter construction of concrete arch bridge
Engineering Index Backfile | 1929
Engineering Index Backfile | 1895
|Engineering Index Backfile | 1963
Engineering Index Backfile | 1945