Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New line of the Burlington in Iowa
An illustrated description of the work being done on the revision of the alignment of the tracks, especially describing the portion between Murray and Creston, Iowa. (1600 w.)
New line of the Burlington in Iowa
An illustrated description of the work being done on the revision of the alignment of the tracks, especially describing the portion between Murray and Creston, Iowa. (1600 w.)
New line of the Burlington in Iowa
Ry Age
1901
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Creosoted pile foundations in Burlington, Iowa
Engineering Index Backfile | 1945
The Cable Stayed Mississippi River Bridge at Burlington, Iowa
British Library Conference Proceedings | 1993
|The Cable Stayed Mississippi River Bridge at Burlington, Iowa
British Library Conference Proceedings | 1993
|British Library Online Contents | 1996
|