Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New weaving mill is built in 60 days
Features of new Sidney Blumenthal and Co mill at Scotland Neck, NC; there are only two rows of columns in 132 ft width, roof and ceiling are aluminum insulated with rock wool; building is of steel, aluminum, and masonry construction.
New weaving mill is built in 60 days
Features of new Sidney Blumenthal and Co mill at Scotland Neck, NC; there are only two rows of columns in 132 ft width, roof and ceiling are aluminum insulated with rock wool; building is of steel, aluminum, and masonry construction.
New weaving mill is built in 60 days
Textile World
Pressley, R.B. (Autor:in)
Textile World ; 104
1954
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Guam superhighway built in sixty days
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1942
Warehouse addition built in 100 days
Engineering Index Backfile | 1954
|Bar mill built to serve market
Engineering Index Backfile | 1953
|Replica of federal hall built in 31 days
Engineering Index Backfile | 1932