Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of consolidated fill [midline ellipsis] lifts slow order over swamp
Applying modern principles of soil mechanics, sufficient stabilization of 60 ft layer of swampy muck was effected to construct stable embankment for two-track main line on New York and Long Branch over boggy meadow at Matawan, NJ.
Construction of consolidated fill [midline ellipsis] lifts slow order over swamp
Applying modern principles of soil mechanics, sufficient stabilization of 60 ft layer of swampy muck was effected to construct stable embankment for two-track main line on New York and Long Branch over boggy meadow at Matawan, NJ.
Construction of consolidated fill [midline ellipsis] lifts slow order over swamp
Ry Track Structures
1954
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Weather [midline ellipsis] waves [midline ellipsis] and offshore oil
Engineering Index Backfile | 1957
|Roadbuilding [midline ellipsis] 1939 accomplishments [midline ellipsis] 1940 budgets and outlook
Engineering Index Backfile | 1940
Glenbawn dam [midline ellipsis] construction recently completed
Engineering Index Backfile | 1958
[midline ellipsis] for duration
Engineering Index Backfile | 1942
Engineering Index Backfile | 1945