Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Highway blasted out of solid rock bluff face
Construction of Iowa United States Highway no. 55, blasted out of solid rock face of river bluff below McGregor, in Clayton County; cost $591,201.
Highway blasted out of solid rock bluff face
Construction of Iowa United States Highway no. 55, blasted out of solid rock face of river bluff below McGregor, in Clayton County; cost $591,201.
Highway blasted out of solid rock bluff face
Highway Engr. Contractor
Mann, F.H. (Autor:in)
1931
3 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Blasted rock makes way for cable
Tema Archiv | 1978
|Experience in Removing Blasted Underwater Rock
British Library Online Contents | 1992
|Experience in removing blasted underwater rock
Online Contents | 1992
|Experience in removing blasted underwater rock
Springer Verlag | 1992
|Fire Tests in a Blasted Rock Tunnel
NTIS | 1997
|