A platform for research: civil engineering, architecture and urbanism
Construction of Iowa United States Highway no. 55, blasted out of solid rock face of river bluff below McGregor, in Clayton County; cost $591,201.
Construction of Iowa United States Highway no. 55, blasted out of solid rock face of river bluff below McGregor, in Clayton County; cost $591,201.
Highway blasted out of solid rock bluff face
Highway Engr. Contractor
Mann, F.H. (author)
1931
3 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Blasted rock makes way for cable
Tema Archive | 1978
|Experience in Removing Blasted Underwater Rock
British Library Online Contents | 1992
|Experience in removing blasted underwater rock
Online Contents | 1992
|Experience in removing blasted underwater rock
Springer Verlag | 1992
|Fire Tests in a Blasted Rock Tunnel
NTIS | 1997
|