Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Railroad from The Pas to Churchill, 510 mi. long; severe physical and climatic conditions encountered; development of Churchill townsite; sewers and water mains; terminal facilities; water-supply difficulties; frostproof wells; six steel bridges constructed.
Railroad from The Pas to Churchill, 510 mi. long; severe physical and climatic conditions encountered; development of Churchill townsite; sewers and water mains; terminal facilities; water-supply difficulties; frostproof wells; six steel bridges constructed.
Construction of Hudson bay railway
Can. Engr
Brown, H.D. (Autor:in)
Canadian Engineer ; 61
1931
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1903
Engineering Index Backfile | 1886
The Churchill harbour terminus of the Hudson bay railway
Engineering Index Backfile | 1929
A Protocol for Railway Systems Integration: The Hudson-Bergen Experience
British Library Conference Proceedings | 1999
|