A platform for research: civil engineering, architecture and urbanism
Railroad from The Pas to Churchill, 510 mi. long; severe physical and climatic conditions encountered; development of Churchill townsite; sewers and water mains; terminal facilities; water-supply difficulties; frostproof wells; six steel bridges constructed.
Railroad from The Pas to Churchill, 510 mi. long; severe physical and climatic conditions encountered; development of Churchill townsite; sewers and water mains; terminal facilities; water-supply difficulties; frostproof wells; six steel bridges constructed.
Construction of Hudson bay railway
Can. Engr
Brown, H.D. (author)
Canadian Engineer ; 61
1931
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1903
Engineering Index Backfile | 1886
The Churchill harbour terminus of the Hudson bay railway
Engineering Index Backfile | 1929
A Protocol for Railway Systems Integration: The Hudson-Bergen Experience
British Library Conference Proceedings | 1999
|