Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction at stoney-gate concrete dam consisting of 100 six-meter bays; with piers 13 m. high, costing 1,945,000 Egyptian pounds. (See also - nos. 3916 Jan. 30, 1931, pp. 122-124; Instn. Civil Engrs. -- Minutes Proc., Paper no. 4816, 1930-1931, 28 pp., 7 figs. on supp. plate; Engineering, vol. 131, no. 3390, Jan. 2, 1931, pp. 20-22, 8 figs. partly on p. 16; Civil Eng., vol. 26, no. 1, June 1931, pp. 19-20 and Water and Water Eng., vol. 33, no. 389, May 20, 1931, pp. 216-217)
Construction at stoney-gate concrete dam consisting of 100 six-meter bays; with piers 13 m. high, costing 1,945,000 Egyptian pounds. (See also - nos. 3916 Jan. 30, 1931, pp. 122-124; Instn. Civil Engrs. -- Minutes Proc., Paper no. 4816, 1930-1931, 28 pp., 7 figs. on supp. plate; Engineering, vol. 131, no. 3390, Jan. 2, 1931, pp. 20-22, 8 figs. partly on p. 16; Civil Eng., vol. 26, no. 1, June 1931, pp. 19-20 and Water and Water Eng., vol. 33, no. 389, May 20, 1931, pp. 216-217)
Nag hammadi barrage, upper Egypt
Engineer
Ellison, A.R. (Autor:in)
Engineer ; 151
1931
3 pages
19 Figs. partly on p. 134 and 160
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|