Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction at stoney-gate concrete dam consisting of 100 six-meter bays; with piers 13 m. high, costing 1,945,000 Egyptian pounds. (see also Engineering, vol. 131, no. 3390, Jan. 2, 1931, pp. 20-22, 8 figs. partly on p. 16; Engineer, vol. 151, nos. 3916 and 3917, Jan. 30, 1931, pp. 122-124, and Feb. 6, pp. 150-152, 19 figs. partly on p. 134 and 160; Civil Eng., vol. 26, no. 1, June 1931, pp. 19-20 and Water and Water Eng., vol. 33, no. 389, May 20, 1931, pp. 216-217)
Construction at stoney-gate concrete dam consisting of 100 six-meter bays; with piers 13 m. high, costing 1,945,000 Egyptian pounds. (see also Engineering, vol. 131, no. 3390, Jan. 2, 1931, pp. 20-22, 8 figs. partly on p. 16; Engineer, vol. 151, nos. 3916 and 3917, Jan. 30, 1931, pp. 122-124, and Feb. 6, pp. 150-152, 19 figs. partly on p. 134 and 160; Civil Eng., vol. 26, no. 1, June 1931, pp. 19-20 and Water and Water Eng., vol. 33, no. 389, May 20, 1931, pp. 216-217)
Nag hammadi barrage, upper Egypt
Instn. Civil Engrs. -- Minutes Proc., Paper
Ellison, A.R. (Autor:in)
1931
28 pages
7 Figs. on Supp. plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|Nag hammadi barrage, upper Egypt
Engineering Index Backfile | 1931
|