Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Washaway and reconstruction of the Nerbudda bridge on the great Indian Peninsula railway
Construction of new steel-truss bridge consisting of six 169-ft. through spans and two approach deck spans of 45 ft. 2 in. at each end; main spans are carried on steel trestles; foundations of each trestle are four 12-ft. diam. steel cylinders filled with cement concrete; tests on foundations were made by dropping cannon ball. (See also Instn. Civil Engrs. -- Excerpt Min. Proc., vol. 232, no. 4795, 1931, 30 pp., 11 figs., some on supp. plate)
Washaway and reconstruction of the Nerbudda bridge on the great Indian Peninsula railway
Construction of new steel-truss bridge consisting of six 169-ft. through spans and two approach deck spans of 45 ft. 2 in. at each end; main spans are carried on steel trestles; foundations of each trestle are four 12-ft. diam. steel cylinders filled with cement concrete; tests on foundations were made by dropping cannon ball. (See also Instn. Civil Engrs. -- Excerpt Min. Proc., vol. 232, no. 4795, 1931, 30 pp., 11 figs., some on supp. plate)
Washaway and reconstruction of the Nerbudda bridge on the great Indian Peninsula railway
Engineering
Minnitt, G.C. (Autor:in)
Engineering ; 131
1931
2 pages
11 figs. some on supp. plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The reconstruction of Koari Bridge, Great Indian Peninsula Railway
Engineering Index Backfile | 1917
|Washaway and reconstruction of Nerbudda Bridge on Great Indian Peninsula Railway
Engineering Index Backfile | 1931
|Washaway and reconstruction of the Nerbudda bridge on the Great Indian Peninsula railway
Engineering Index Backfile | 1931
|German corridor coaches for the Great Indian Peninsula railway Co
Engineering Index Backfile | 1928
Engineering Index Backfile | 1930