Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
449.2 m long sevenspan prestressed concrete bridge is built as continuous beam on fixed or horizontally sliding bearings, without expansion joint in its total length from abutment to abutment; roadway is divided lengthwise into two symmetric halves, each 15 m wide and each carried by continuous box girder supported on rectangular hollow reinforced concrete piers 57 m above water level; new cantilever method of construction, combined with cable suspension of spans being built, is described.
449.2 m long sevenspan prestressed concrete bridge is built as continuous beam on fixed or horizontally sliding bearings, without expansion joint in its total length from abutment to abutment; roadway is divided lengthwise into two symmetric halves, each 15 m wide and each carried by continuous box girder supported on rectangular hollow reinforced concrete piers 57 m above water level; new cantilever method of construction, combined with cable suspension of spans being built, is described.
New highway bridge over Lahn river near Limburg
Der Neubau der Autobahnbruecke ueber die Lahn bei Limburg
Bauingenieur ; 40
1965
8 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Temporary highway bridge over Lahn river at Limburg, Germany
Engineering Index Backfile | 1950
|TIBKAT | 1944
|Der Bau der Lahntalbrücke bei Limburg-Lahn
Online Contents | 2001
Der Dom zu Limburg an der Lahn
UB Braunschweig | 1994
|Vergaberechtsforum 2010 in Limburg an der Lahn
Online Contents | 2010
|