Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of bridge over Caroni River (Venezuela)
Prestressed concrete bridge has four 96 m long and two 48 m long spans; notable feature of construction technique is launching of 480 m long, 10.3 m wide, 5.4 m high continuous box beam weighing 10,000 ton over auxiliary and permanent piers spaced at 48 m intervals; Teflon slippers were fixed to bottom of beam surface and made to slide on chrome-plated steel plates fixed to pier heads.
Construction of bridge over Caroni River (Venezuela)
Prestressed concrete bridge has four 96 m long and two 48 m long spans; notable feature of construction technique is launching of 480 m long, 10.3 m wide, 5.4 m high continuous box beam weighing 10,000 ton over auxiliary and permanent piers spaced at 48 m intervals; Teflon slippers were fixed to bottom of beam surface and made to slide on chrome-plated steel plates fixed to pier heads.
Construction of bridge over Caroni River (Venezuela)
Construction d'un pont sur le Caroni (Venezuela)
Fernandez, A. (Autor:in)
1965
4 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1962
British Library Conference Proceedings | 1995
|D23-1 THE INFLUENCE OF ENSO ON THE FLOWS OF THE CARONI RIVER IN VENEZUELA OVER THE PAST 50 YEARS
British Library Conference Proceedings | 2005
|Invited lecture: Double End Dump River Closure At Tocoma Project on The Caroni River
British Library Conference Proceedings | 2013
|Desarrollo del Bajo Caroni (Guayana Venezolana - La central de Caruachi)
British Library Conference Proceedings | 2003
|