Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Spokane's $4.5 million airport complex is nearing completion
Construction methods used for building structures of new terminal and finger buildings; central building was designed on system of 24 piers, each pier being seat for one of concrete inverted-arch beams, 24 of which join at center around 24-ft diam steel compression ring; beams were cast at site in exact position they were to assume when placed on top of piers.
Spokane's $4.5 million airport complex is nearing completion
Construction methods used for building structures of new terminal and finger buildings; central building was designed on system of 24 piers, each pier being seat for one of concrete inverted-arch beams, 24 of which join at center around 24-ft diam steel compression ring; beams were cast at site in exact position they were to assume when placed on top of piers.
Spokane's $4.5 million airport complex is nearing completion
Pac Bldr Engr
Heylman, W.C. (Autor:in) / Trogdon, W.H. (Autor:in)
1964
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2000
Bridge at Umhlanga nearing completion
British Library Online Contents | 2001
Prestressed bridge rapidly nearing completion
Engineering Index Backfile | 1950
|Zion-mount Carmel road nearing completion
Engineering Index Backfile | 1928
SWEDEN SUPPLEMENT - Ultra deepwater drillships nearing completion
Online Contents | 2007