Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of new control tower at Orly Airport
53 m high tower and 1080 sq m office and technical building have welded and bolted steel framework, with reinforced concrete floor slabs; structural features as well as soundproofing and air conditioning systems are described; cross sections and floor plans of tower and building.
Construction of new control tower at Orly Airport
53 m high tower and 1080 sq m office and technical building have welded and bolted steel framework, with reinforced concrete floor slabs; structural features as well as soundproofing and air conditioning systems are described; cross sections and floor plans of tower and building.
Construction of new control tower at Orly Airport
Construction d'une nouvelle tour de controle sur l'aeroport d' orly
Vicariot, H. (Autor:in) / Andreu, P. (Autor:in) / Bienarrive, M. (Autor:in)
1965
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1960
|Construction of new hangar N3 at Orly airport
Engineering Index Backfile | 1965
|Airport terminal building at Orly, France
Engineering Index Backfile | 1955
|Construction of new East-West runway at Orly airport
Engineering Index Backfile | 1965
|Hangar No. 6 of Paris-Orly airport
Engineering Index Backfile | 1960
|