Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of new East-West runway at Orly airport
Series of five related articles describing work in progress on 3650 m long, 45 m wide runway; general considerations regarding direction and situation of runway; improved lighting system of runway and its approaches; organization of building site; materials, equipment, construction methods; quality control of raw materials and concrete pavement mixtures.
Construction of new East-West runway at Orly airport
Series of five related articles describing work in progress on 3650 m long, 45 m wide runway; general considerations regarding direction and situation of runway; improved lighting system of runway and its approaches; organization of building site; materials, equipment, construction methods; quality control of raw materials and concrete pavement mixtures.
Construction of new East-West runway at Orly airport
Construction d'une nouvelle piste Est-Ouest sur l'aeroport d'orly
Andreu, P. (Autor:in) / Prinz, C. (Autor:in) / Heiser, L. (Autor:in) / Goudeneche, R. (Autor:in) / Lorin, R. (Autor:in)
1965
19 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TERRASSEMENTS - TRAVAUX ROUTIERS - Paris-Orly Airport. Renovation of runway 4.
Online Contents | 2007
|Quick repair of concrete slabs at Orly airport runway using alumina cement
Engineering Index Backfile | 1963
|Engineering Index Backfile | 1960
|Construction of new hangar N3 at Orly airport
Engineering Index Backfile | 1965
|Construction of new control tower at Orly Airport
Engineering Index Backfile | 1965
|