Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Multi-layer lining for reservoir
Baldwin Hills Reservoir of Los Angeles Department of Water and Power having capacity of 900 acre ft has been made impervious below 65 ft depth of water by 3 in. asphaltic pavement, 10 ft compacted earthfill, 4 in. layer of porous concrete to collect and direct possible seepage, and asphaltic membrane as final water seal against earth of subgrade; work stages shown in photographs.
Multi-layer lining for reservoir
Baldwin Hills Reservoir of Los Angeles Department of Water and Power having capacity of 900 acre ft has been made impervious below 65 ft depth of water by 3 in. asphaltic pavement, 10 ft compacted earthfill, 4 in. layer of porous concrete to collect and direct possible seepage, and asphaltic membrane as final water seal against earth of subgrade; work stages shown in photographs.
Multi-layer lining for reservoir
Western Construction News
1950
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1942
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|Re‐Lining the Verona Reservoir
Wiley | 1926
|