Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
B. and O. completes bridge replacement, line change
Baltimore and Ohio replaced obsolete through girder spans of bridge across White river with deck girder spans; handling of spans 89 ft long and weighing 82 tons with single derrick car; background of project and method used in carrying it out are described. (See also Ry Age v 126 n 21 May 27 1950 p 1030-3)
B. and O. completes bridge replacement, line change
Baltimore and Ohio replaced obsolete through girder spans of bridge across White river with deck girder spans; handling of spans 89 ft long and weighing 82 tons with single derrick car; background of project and method used in carrying it out are described. (See also Ry Age v 126 n 21 May 27 1950 p 1030-3)
B. and O. completes bridge replacement, line change
Ry Eng Maintenance
Sloan, C.E. (Autor:in)
1950
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
B. and O. completes bridge replacement, line change
Engineering Index Backfile | 1950
|Bisso Marine Completes Removal of Bridge
Online Contents | 1995
Florida east coast railway completes bridge
Engineering Index Backfile | 1925
Main-line bridge replacement in Sweden
Engineering Index Backfile | 1949
Baltimore and Ohio completes large bridge project
Engineering Index Backfile | 1921
|