A platform for research: civil engineering, architecture and urbanism
B. and O. completes bridge replacement, line change
Baltimore and Ohio replaced obsolete through girder spans of bridge across White river with deck girder spans; handling of spans 89 ft long and weighing 82 tons with single derrick car; background of project and method used in carrying it out are described. (See also Ry Age v 126 n 21 May 27 1950 p 1030-3)
B. and O. completes bridge replacement, line change
Baltimore and Ohio replaced obsolete through girder spans of bridge across White river with deck girder spans; handling of spans 89 ft long and weighing 82 tons with single derrick car; background of project and method used in carrying it out are described. (See also Ry Age v 126 n 21 May 27 1950 p 1030-3)
B. and O. completes bridge replacement, line change
Ry Eng Maintenance
Sloan, C.E. (author)
1950
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
B. and O. completes bridge replacement, line change
Engineering Index Backfile | 1950
|Bisso Marine Completes Removal of Bridge
Online Contents | 1995
Florida east coast railway completes bridge
Engineering Index Backfile | 1925
Main-line bridge replacement in Sweden
Engineering Index Backfile | 1949
Richmond completes interesting program of bridge construction
Engineering Index Backfile | 1935