Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Old bridge spans launched into river
Method employed for dismantling Monon's Wabash River bridge when it replaced old truss spans with new deck plate girder spans; savings effected in cost of bridge rehabilitation through procedure in which, using launching beams, old spans were dropped into river, and then cut up and dragged out as scrap; new spans of shorter length installed by crane without use of falsework. (see also Ry Age v 128 n 5 Feb 4 1950 p 262-5)
Old bridge spans launched into river
Method employed for dismantling Monon's Wabash River bridge when it replaced old truss spans with new deck plate girder spans; savings effected in cost of bridge rehabilitation through procedure in which, using launching beams, old spans were dropped into river, and then cut up and dragged out as scrap; new spans of shorter length installed by crane without use of falsework. (see also Ry Age v 128 n 5 Feb 4 1950 p 262-5)
Old bridge spans launched into river
Ry Eng Maintenance
1950
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Old bridge spans launched into river
Engineering Index Backfile | 1950
Deck spans of Susquehanna river bridge
Engineering Index Backfile | 1912
Prestressed concrete bridge spans Humptulips river
Engineering Index Backfile | 1953
Discussion of River Spans of Cincinnati Bridge
ASCE | 2021
|Closure to River Spans of Cincinnati Bridge
ASCE | 2021
|