Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Novel construction solves shoring of Steep Sandhill
Construction of Laguna Honda Boulevard, San Francisco; special well-boring rig designed; construction of concrete retaining walls.
Novel construction solves shoring of Steep Sandhill
Construction of Laguna Honda Boulevard, San Francisco; special well-boring rig designed; construction of concrete retaining walls.
Novel construction solves shoring of Steep Sandhill
Eng. Contracting
Taylor, C.M. (Autor:in)
1930
3 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Old method with new twist solves bank shoring problem
Engineering Index Backfile | 1964
|Shoring speeds up bridge construction
Online Contents | 1994
Engineering Index Backfile | 1935
|Springer Verlag | 2022
|SHORING SYSTEM, BEAM ASSEMBLY FOR A SHORING SYSTEM, AND SHORING SYSTEM COMPONENTS
Europäisches Patentamt | 2023
|