Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sand-clogged outfall sewer cleaned and joints calked
Report on experience of sewer department of Santa Barbara. Calif.: storm-water silt blocks outfall and settlement opens joints; divers used sand pump and lead wool; repair methods.
Sand-clogged outfall sewer cleaned and joints calked
Report on experience of sewer department of Santa Barbara. Calif.: storm-water silt blocks outfall and settlement opens joints; divers used sand pump and lead wool; repair methods.
Sand-clogged outfall sewer cleaned and joints calked
Eng. News-Rec
Walker, L.R. (Autor:in)
Engineering News-Record ; 104
1930
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Intelligent Clogged Sewer Control System
IEEE | 2019
|Engineering Index Backfile | 1940
|Engineering Index Backfile | 1914
|Wellpoints in pumped-sand fill facilitate outfall sewer construction
Engineering Index Backfile | 1946
Manchester, Mass., outfall sewer
Engineering Index Backfile | 1917
|