Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wellpoints in pumped-sand fill facilitate outfall sewer construction
Sewer across Jamaica Bay, NY, was constructed by pumping in hydraulic fill and then draining it by system of wellpoints thus permitting laying sewer in 1350-ft open trench whose outer end was 30 ft below high tide; illustrated description of construction job, and schematic layout of wellpoints.
Wellpoints in pumped-sand fill facilitate outfall sewer construction
Sewer across Jamaica Bay, NY, was constructed by pumping in hydraulic fill and then draining it by system of wellpoints thus permitting laying sewer in 1350-ft open trench whose outer end was 30 ft below high tide; illustrated description of construction job, and schematic layout of wellpoints.
Wellpoints in pumped-sand fill facilitate outfall sewer construction
Eng News-Rec
Engineering News-Record ; 137
1946
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1914
|Engineering Index Backfile | 1940
|Sand-clogged outfall sewer cleaned and joints calked
Engineering Index Backfile | 1930
|Manchester, Mass., outfall sewer
Engineering Index Backfile | 1917
|Manchester's new outfall sewer
Engineering Index Backfile | 1922