Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Early working of drainage-system of Cairo; difficulties which have arisen in connection with ventilation of collector, corrosion of concrete in collector, and unforeseen loading of system; results of investigations and description of extension works, comprising new pumping station, 46 in. diam, rising main, and new main collector and main sewers; cost 800,000 Egyptian pounds. (See also Instn. Civil Engrs. -- Excerpt Minutes Proc., vol. 23, 1930, 27 pp., 20 figs. partly on supp. plate; Engineering, vol. 130, no. 3388, Dec. 19, 1930, p. 782)
Early working of drainage-system of Cairo; difficulties which have arisen in connection with ventilation of collector, corrosion of concrete in collector, and unforeseen loading of system; results of investigations and description of extension works, comprising new pumping station, 46 in. diam, rising main, and new main collector and main sewers; cost 800,000 Egyptian pounds. (See also Instn. Civil Engrs. -- Excerpt Minutes Proc., vol. 23, 1930, 27 pp., 20 figs. partly on supp. plate; Engineering, vol. 130, no. 3388, Dec. 19, 1930, p. 782)
Cairo main drainage extensions
Surveyor
Pinson, A.O.W.D. (Autor:in)
Surveyor ; 78
1930
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cairo main drainage extensions
Engineering Index Backfile | 1931
|Cairo main drainage extensions
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1916
|Wiley | 1947
|CAIRO METRO Planning ahead in Cairo
Online Contents | 2011