Early working of drainage-system of Cairo; difficulties which have arisen in connection with ventilation of collector, corrosion of concrete in collector, and unforeseen loading of system; results of investigations and description of extension works, comprising new pumping station, 46 in. diam, rising main, and new main collector and main sewers; cost 800,000 Egyptian pounds. (see also Engineering, vol. 130, no. 3388, Dec. 19, 1930, p. 782 and Surveyor, vol. 78, no. 2020, Oct. 10, 1930, p. 344)
Early working of drainage-system of Cairo; difficulties which have arisen in connection with ventilation of collector, corrosion of concrete in collector, and unforeseen loading of system; results of investigations and description of extension works, comprising new pumping station, 46 in. diam, rising main, and new main collector and main sewers; cost 800,000 Egyptian pounds. (see also Engineering, vol. 130, no. 3388, Dec. 19, 1930, p. 782 and Surveyor, vol. 78, no. 2020, Oct. 10, 1930, p. 344)
Cairo main drainage extensions
Instn. Civil Engrs. -- Excerpt Minutes Proc
Pinson, A.O.W.D. (Autor:in)
1930
27 pages
20 Figs. partly on Supp. plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cairo main drainage extensions
Engineering Index Backfile | 1931
|Cairo main drainage extensions
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1916
|Wiley | 1947
|CAIRO METRO Planning ahead in Cairo
Online Contents | 2011