Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction methods on Cheyenne reservoir
Construction of concrete filtered-water storage reservoir of 7,000, 000 gal. capacity; cost of $52,435 included one 20-in. inlet, one 30-in. outlet, fencing, and leveling of embankment.
Construction methods on Cheyenne reservoir
Construction of concrete filtered-water storage reservoir of 7,000, 000 gal. capacity; cost of $52,435 included one 20-in. inlet, one 30-in. outlet, fencing, and leveling of embankment.
Construction methods on Cheyenne reservoir
Water Works Sewerage
Revis, P.R. (Autor:in)
1930
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Masonry dam for the granite springs reservoir, Cheyenne, Wyo.
Engineering Index Backfile | 1905
|Masonry dam for the granite springs reservoir, Cheyenne water-works
Engineering Index Backfile | 1905
|Engineering Index Backfile | 1962
|Cheyenne Neighborhood Conservation Plan
NTIS | 1984
The Broadmoor-Cheyenne mountain highway
Engineering Index Backfile | 1926
|