Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Technique of smooth blasting is being used to excavate for underground combat operations center at Cheyenne Mountain, Colo; 2 entrance tunnels give access to 6 chambers, 450-ft long, 45-ft wide and 60-ft high; vertical jointing prompted cross section of tunnel with arch or barrel roof instead of rectangular section; blasting and drilling pattern has objective of protecting solid rock from secondary stresses.
Technique of smooth blasting is being used to excavate for underground combat operations center at Cheyenne Mountain, Colo; 2 entrance tunnels give access to 6 chambers, 450-ft long, 45-ft wide and 60-ft high; vertical jointing prompted cross section of tunnel with arch or barrel roof instead of rectangular section; blasting and drilling pattern has objective of protecting solid rock from secondary stresses.
Cheyenne mountain project
Can Min J
Smith, R. (Autor:in)
1962
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Broadmoor-Cheyenne mountain highway
Engineering Index Backfile | 1926
|Cheyenne Neighborhood Conservation Plan
NTIS | 1984
Construction methods on Cheyenne reservoir
Engineering Index Backfile | 1930
|Concrete arched dam near Cheyenne, Wyoming
Engineering Index Backfile | 1913
|