Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Underground hoisting plant transfer and erection
Shaft no. 5 of United Verde Copper Co., at Jerome, Ariz., is used exclusively for hoisting rock, and extends from sheave room on 800 ft. level to lowest, or 3000 ft. level; old hoist room and construction of new hoist room and installation of equipment. (1 on front cover page)
Underground hoisting plant transfer and erection
Shaft no. 5 of United Verde Copper Co., at Jerome, Ariz., is used exclusively for hoisting rock, and extends from sheave room on 800 ft. level to lowest, or 3000 ft. level; old hoist room and construction of new hoist room and installation of equipment. (1 on front cover page)
Underground hoisting plant transfer and erection
Eng. Min. Jl
Mills, C.E. (Autor:in)
1930
4 pages
9 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction method of robot for hoisting prefabricated floor erection support
Europäisches Patentamt | 2024
|Positioning device for hoisting erection of expressway bridge box girder
Europäisches Patentamt | 2022
|Erection of Long-Span Suspension Bridges by Direct Hoisting Method
British Library Conference Proceedings | 1998
|Lateral buckling problems in hoisting and erection of slender beams
Engineering Index Backfile | 1960
|Europäisches Patentamt | 2024
|