Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Southern Pacific to build 30-mile line diversion
Construction through rough country includes 1 temporary and 12 permanent tunnels and 8 bridges, one of which will be 370 ft high.
Southern Pacific to build 30-mile line diversion
Construction through rough country includes 1 temporary and 12 permanent tunnels and 8 bridges, one of which will be 370 ft high.
Southern Pacific to build 30-mile line diversion
Ry Age
Railway Age ; 104
1938
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Southern Pacific to build 30-mile line diversion
Engineering Index Backfile | 1938
Arrow energy to build 360-mile pipeline
Online Contents | 2014
Comparison Between Design-Build And Design-Bid-Build Transportation Projects Using Lane Mile Data
British Library Conference Proceedings | 2007
|4-mile conveyor moves moraine to build portage mountain dam
Engineering Index Backfile | 1964
Gantries applied in three ways to build 4-mile outfall sewer
Engineering Index Backfile | 1929