Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods of rock bolting adopted in tunnel construction for Bhakra dam project; steep slopes upstream at chain 10 were bolted with 1 1/2-in. diam bolts 40-in. long, staggered at 10-ft intervals, while at steep slopes on switchyard site, bolts were of 1 1/4-in. diam and 30-ft long spread at 10 ft. c to c in square pattern.
Methods of rock bolting adopted in tunnel construction for Bhakra dam project; steep slopes upstream at chain 10 were bolted with 1 1/2-in. diam bolts 40-in. long, staggered at 10-ft intervals, while at steep slopes on switchyard site, bolts were of 1 1/4-in. diam and 30-ft long spread at 10 ft. c to c in square pattern.
Rock bolting
Indian J Power River Valley Development
Chugh, C.P. (Autor:in)
1963
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1963
Reinforcement of Rock Slope Through Rock Bolting
British Library Conference Proceedings | 2002
|Rock bolting - A practical review
British Library Conference Proceedings | 1996
|International Symposium on Rock Bolting
Springer Verlag | 1984
|Jennmar Develops Rock Bolting Solutions
Online Contents | 2017
|