Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
In construction of bridge across Rondout Creek, near Eddysville, NY, specially designed towers held two halves of 340 ft all-welded arch on barge for 100 mi trip up Hudson River to bridge site; jacks fitted between twin legs of towers lifted each 150 ton section into place; entire bridge erected without cranes or heavy equipment.
In construction of bridge across Rondout Creek, near Eddysville, NY, specially designed towers held two halves of 340 ft all-welded arch on barge for 100 mi trip up Hudson River to bridge site; jacks fitted between twin legs of towers lifted each 150 ton section into place; entire bridge erected without cranes or heavy equipment.
Jacks on barge erect arch bridge
Construction Methods Equipment
Mooney, W.G. (Autor:in)
1958
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete arch ribs of rogue river bridge decentered by built-in jacks
Engineering Index Backfile | 1933
|Cantilever methods erect three-span continuous truss bridge with tied-arch middle span
Engineering Index Backfile | 1943
Bridge travelers erect aircraft building
Engineering Index Backfile | 1942
Raising a concrete girder bridge with screw jacks
Engineering Index Backfile | 1915
|Modular digital bridge raising system using preventing bridge falling safety jacks
Europäisches Patentamt | 2021