Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cantilever methods erect three-span continuous truss bridge with tied-arch middle span
Straight and balanced cantilever erection illustrated and described, as it was applied to steel construction for new highway bridge to carry route US 20 across Mississippi River; unique feature of bridge design is that 3-span structure is fixed in place at only one point and not at 2 bearings on same pier as is customary. (p 48-51, 114, 118, 121, 124, 126, 128, 130)
Cantilever methods erect three-span continuous truss bridge with tied-arch middle span
Straight and balanced cantilever erection illustrated and described, as it was applied to steel construction for new highway bridge to carry route US 20 across Mississippi River; unique feature of bridge design is that 3-span structure is fixed in place at only one point and not at 2 bearings on same pier as is customary. (p 48-51, 114, 118, 121, 124, 126, 128, 130)
Cantilever methods erect three-span continuous truss bridge with tied-arch middle span
Construction Methods
Construction Methods ; 25
1943
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Investigation of Bridge Floor-Truss Behavior in Tied-Arch Span
Online Contents | 1996
|Investigation of Bridge floor-Truss Behavior in Tied-Arch Span
British Library Online Contents | 1996
|Overhauling truss vehicle for large-span steel truss arch bridge arch
Europäisches Patentamt | 2020
|