Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete set slowed down to step up bridge construction
Retarding set of concrete for 8 or 10 hr speeded completion of 1677 ft Wolcott Avenue Bridge over Connecticut River at Hartford by several months; keeping concrete plastic until entire unit had been placed and all deflection had occurred in falsework, and then revibrating entire concrete mass, provided strong structure for early post-tensioning.
Concrete set slowed down to step up bridge construction
Retarding set of concrete for 8 or 10 hr speeded completion of 1677 ft Wolcott Avenue Bridge over Connecticut River at Hartford by several months; keeping concrete plastic until entire unit had been placed and all deflection had occurred in falsework, and then revibrating entire concrete mass, provided strong structure for early post-tensioning.
Concrete set slowed down to step up bridge construction
Civ Eng (NY)
Linberg, G.C. (Autor:in) / Schupack, M. (Autor:in)
1958
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Fears grow of 'slowed-down' planning process
Online Contents | 2008
UNCTAD: World Seaborne Trade Slowed Down in 1998
British Library Online Contents | 1999
Tracker - The decline in construction activity slowed in August
Online Contents | 2012
Prestressed concrete bridge construction
Engineering Index Backfile | 1965
|Precast concrete bridge construction
Engineering Index Backfile | 1944
|