Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Substructure construction for new Melbourne-Footscray Bridge
One abutment and river pier of 530 ft long reinforced concrete bridge at Footscray, Australia are founded on rock, involving construction within large cofferdams incorporating some unusual features; remaining abutment and piers are supported on piled foundations, concrete piles for which were cast at site.
Substructure construction for new Melbourne-Footscray Bridge
One abutment and river pier of 530 ft long reinforced concrete bridge at Footscray, Australia are founded on rock, involving construction within large cofferdams incorporating some unusual features; remaining abutment and piers are supported on piled foundations, concrete piles for which were cast at site.
Substructure construction for new Melbourne-Footscray Bridge
Commonwealth Engr
1958
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast prestressed concrete construction for school building at Footscray, Victoria
Engineering Index Backfile | 1964
|George Washington Bridge: Construction of Substructure
ASCE | 2021
|George Washington bridge: Construction of substructure
Engineering Index Backfile | 1933
|George Washington bridge: Construction of substructure
Engineering Index Backfile | 1933
|Bridge substructure integral pouring construction method
Europäisches Patentamt | 2024
|