Verwoerd Dam construction involves 3 1/2-yr concreting program calling for 2.1 million cu yd of concrete for 3120 ft long wall, which is to rise 280 ft above foundation level; when completed, it will have gross storage capacity of 6.75 million acre-ft; design of wall is double-curved concrete arch with spiral form of curvature in plan; spiral curve was adopted to obtain better distribution of stresses because of wide shallow valley; automatic crushing and batching plants speed construction of dam. (n 8 Aug 1968 p 32, 40, n 9 Sept p 40, 44, 50) (09766)
Verwoerd Dam construction involves 3 1/2-yr concreting program calling for 2.1 million cu yd of concrete for 3120 ft long wall, which is to rise 280 ft above foundation level; when completed, it will have gross storage capacity of 6.75 million acre-ft; design of wall is double-curved concrete arch with spiral form of curvature in plan; spiral curve was adopted to obtain better distribution of stresses because of wide shallow valley; automatic crushing and batching plants speed construction of dam. (n 8 Aug 1968 p 32, 40, n 9 Sept p 40, 44, 50) (09766)
Orange river project features unusual dam
World Constr
Warden, W. (Autor:in)
World Construction ; 21
1968
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Orange river development project
Engineering Index Backfile | 1965
|Deschutes project -- Features unusual flume and tunnels
Engineering Index Backfile | 1945
|British Library Online Contents | 1999
Unusual design features distinguish hydroelectric project in Peru
Engineering Index Backfile | 1944
The Orange River Project: From dream to reality (Part 1)
British Library Online Contents | 2005