Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Illustrated description of Zia Project Access Road, New Mexico, which replaces narrow gravel surfaced state highway leading to place where atomic bomb was developed and perfected; data on blasts; construction under constant heavy traffic; single and double pipe culverts; construction startedAug 24 1943 and was finished by July 22 1944; total cost including preliminary engineering was approximately $65,500 per mi.
Illustrated description of Zia Project Access Road, New Mexico, which replaces narrow gravel surfaced state highway leading to place where atomic bomb was developed and perfected; data on blasts; construction under constant heavy traffic; single and double pipe culverts; construction startedAug 24 1943 and was finished by July 22 1944; total cost including preliminary engineering was approximately $65,500 per mi.
Atomic bomb highway
Highway Mag
Root, L.F. (Autor:in)
Highway Magazine ; 37
1946
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1945
Engineering Index Backfile | 1946
Atomic bomb grew within concrete walls
Engineering Index Backfile | 1946
Access road to atomic bomb plant
Engineering Index Backfile | 1945