A platform for research: civil engineering, architecture and urbanism
Illustrated description of Zia Project Access Road, New Mexico, which replaces narrow gravel surfaced state highway leading to place where atomic bomb was developed and perfected; data on blasts; construction under constant heavy traffic; single and double pipe culverts; construction startedAug 24 1943 and was finished by July 22 1944; total cost including preliminary engineering was approximately $65,500 per mi.
Illustrated description of Zia Project Access Road, New Mexico, which replaces narrow gravel surfaced state highway leading to place where atomic bomb was developed and perfected; data on blasts; construction under constant heavy traffic; single and double pipe culverts; construction startedAug 24 1943 and was finished by July 22 1944; total cost including preliminary engineering was approximately $65,500 per mi.
Atomic bomb highway
Highway Mag
Root, L.F. (author)
Highway Magazine ; 37
1946
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1945
Engineering Index Backfile | 1946
Atomic bomb grew within concrete walls
Engineering Index Backfile | 1946
Access road to atomic bomb plant
Engineering Index Backfile | 1945