Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Illustrated report on starting stage of construction on Columbia Basin Irrigation Project and on difficulties encountered; description of mechanized equipment, and procedure that is to shorten completion time from 700 to 300 days.
Illustrated report on starting stage of construction on Columbia Basin Irrigation Project and on difficulties encountered; description of mechanized equipment, and procedure that is to shorten completion time from 700 to 300 days.
Construction begins on Columbia Basin canal system
Pac Bldr Engr
Laing, R. (Autor:in)
1946
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Canal Capacity Studies Main Canal Columbia Basin Project
NTIS | 1970
|Columbia basin -- Bacon tunnel construction progress
Engineering Index Backfile | 1948
Suez Canal Authority begins dredging for new mega-port
Online Contents | 1999