A platform for research: civil engineering, architecture and urbanism
Illustrated report on starting stage of construction on Columbia Basin Irrigation Project and on difficulties encountered; description of mechanized equipment, and procedure that is to shorten completion time from 700 to 300 days.
Illustrated report on starting stage of construction on Columbia Basin Irrigation Project and on difficulties encountered; description of mechanized equipment, and procedure that is to shorten completion time from 700 to 300 days.
Construction begins on Columbia Basin canal system
Pac Bldr Engr
Laing, R. (author)
1946
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Canal Capacity Studies Main Canal Columbia Basin Project
NTIS | 1970
|Suez Canal Authority begins dredging for new mega-port
Online Contents | 1999
Columbia basin -- Bacon tunnel construction progress
Engineering Index Backfile | 1948