Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Methods used on Ross DXam by general-shea-morrison
Illustrated report on second phase of construction of Ross Dam on Skagit River in northwestern Washington including rock excavation and scaling of canyon walls, aggregate handling, concrete placing, equipment used, etc; ross dam is third dam in Seattle City Light's 1,120,000-hp hydroelectric project.
Methods used on Ross DXam by general-shea-morrison
Illustrated report on second phase of construction of Ross Dam on Skagit River in northwestern Washington including rock excavation and scaling of canyon walls, aggregate handling, concrete placing, equipment used, etc; ross dam is third dam in Seattle City Light's 1,120,000-hp hydroelectric project.
Methods used on Ross DXam by general-shea-morrison
Pac Bldr Engr
1946
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Sustainable Shea Performance without compromise
British Library Online Contents | 2017
Infrared analysis of clay bricks incorporated with spent shea waste from the shea butter industry
Online Contents | 2017
|British Library Online Contents | 1997
The Rescue of Firefighter Kevin Shea
British Library Online Contents | 1993
|Online Contents | 1997