A platform for research: civil engineering, architecture and urbanism
Methods used on Ross DXam by general-shea-morrison
Illustrated report on second phase of construction of Ross Dam on Skagit River in northwestern Washington including rock excavation and scaling of canyon walls, aggregate handling, concrete placing, equipment used, etc; ross dam is third dam in Seattle City Light's 1,120,000-hp hydroelectric project.
Methods used on Ross DXam by general-shea-morrison
Illustrated report on second phase of construction of Ross Dam on Skagit River in northwestern Washington including rock excavation and scaling of canyon walls, aggregate handling, concrete placing, equipment used, etc; ross dam is third dam in Seattle City Light's 1,120,000-hp hydroelectric project.
Methods used on Ross DXam by general-shea-morrison
Pac Bldr Engr
1946
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Infrared analysis of clay bricks incorporated with spent shea waste from the shea butter industry
Online Contents | 2017
|Sustainable Shea Performance without compromise
British Library Online Contents | 2017
British Library Online Contents | 1997
Online Contents | 1997
Comparative study of some physical properties of the shea kernels in the shea parks in Benin
BASE | 2017
|