Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mattress holds five 48-inch mains on yielding ground
Construction of reinforced concrete mattress foundation to prevent settlement and breaks in five 48-in. mains at Manhattan Ave and West 109th St, New York City.
Mattress holds five 48-inch mains on yielding ground
Construction of reinforced concrete mattress foundation to prevent settlement and breaks in five 48-in. mains at Manhattan Ave and West 109th St, New York City.
Mattress holds five 48-inch mains on yielding ground
Water Works Eng
Brush, W.W. (Autor:in)
1937
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
48-inch mains lowered while in operation
Engineering Index Backfile | 1920
|Condition Assessment of 30-Inch Steel Force Mains
TIBKAT | 2017
|Condition Assessment of Norfolk's 36-Inch Raw Water Mains: Rehabilitation vs. Replacement
British Library Conference Proceedings | 2006
|After five years, lime base stabilization holds up
British Library Online Contents | 1993
Wiley | 1927