Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
48-inch mains lowered while in operation
Work is said to have been performed successfully through solid rock by Philadelphia Bureau of Water, in which weight of mains was utilized in lowering them by gravity and downward motion was controlled.
48-inch mains lowered while in operation
Work is said to have been performed successfully through solid rock by Philadelphia Bureau of Water, in which weight of mains was utilized in lowering them by gravity and downward motion was controlled.
48-inch mains lowered while in operation
Fire Water Eng
Crowe, William M. (Autor:in)
1920
9 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Condition Assessment of 30-Inch Steel Force Mains
TIBKAT | 2017
|Mattress holds five 48-inch mains on yielding ground
Engineering Index Backfile | 1937
|Condition Assessment of Norfolk's 36-Inch Raw Water Mains: Rehabilitation vs. Replacement
British Library Conference Proceedings | 2006
|Wiley | 1927
Online Contents | 1995